Tennessee Construction Pros

Tennessee Construction Pros

Kitchen Remodeling in Memphis, TN

Many Memphis kitchens are in homes built from the 1950s through the 1970s, so remodels often uncover dated wiring, plumbing and painted finishes. Tennessee Construction Pros plans the scope, permits and Shelby County licensing requirements before cabinets come out.

Renovated Knoxville Victorian kitchen with a tall window bay, soft-white cabinets, a walnut island, a navy range alcove and brass lighting.
Illustrative image

Local considerations

Planning kitchen remodeling in Memphis

  1. Alteration or addition permit

    The Division of Planning and Development issues residential alteration permits and residential addition permits as separate permit types. Decide early whether the kitchen stays within the existing walls or expands the footprint, since that affects which permit you apply for.

  2. Shelby County licensing

    Shelby County is one of nine Tennessee counties where residential remodeling projects from $3,000 to $24,999 require a home improvement license. Kitchen projects of $25,000 or more require a state contractor license.

  3. Lead-safe work in older kitchens

    About 64% of Memphis homes were built before 1980. In homes built before 1978, firms that disturb painted cabinets, walls or trim must be EPA- or state-certified and follow lead-safe practices.

Sources (6)

Permits

Kitchen work that changes plumbing, electrical circuits, gas lines, ventilation or walls commonly needs a permit and inspections. Purely cosmetic work, such as painting or replacing cabinets in the same place, may not. Requirements vary by city and county, so the local building department confirms what applies before work begins.

Local permit office: Memphis and Shelby County Division of Planning and Development, Construction Enforcement

New two-story brick and white board-and-batten farmhouse on rolling Middle Tennessee land with a limestone outcrop and early fall colour.
Illustrative image
Crew on a railed scaffold and footed ladder installing new green fiber-cement lap siding and white trim on a Nashville-area Craftsman bungalow.
Illustrative image

What’s included

Kitchen Remodeling in Memphis, TN: scope and options

  • Layout planning for work zones, walkways, storage and seating
  • Removal of old cabinets, counters, flooring and fixtures
  • Cabinet installation, whether new, refaced or partly replaced
  • Countertop templating and installation, plus backsplash tile
  • Plumbing and electrical updates for sinks, appliances and lighting, coordinated with licensed trades where required
  • Range hood and kitchen ventilation installation
  • Appliance placement, clearances and hookup planning
  • Drywall repair, flooring, trim and paint to finish the room

Common options

Keep the layout or change it
Leaving the sink, range and refrigerator where they are limits plumbing, gas and electrical changes. Moving them can fix a poor workflow but adds rough-in work and inspections.
Cabinet approach
Stock, semi-custom or custom cabinets, or refacing boxes that are still sound. The choice affects lead time, available sizes and finish options.
Countertop material
Quartz, natural stone, solid surface, laminate or butcher block. Each differs in heat and stain resistance, seams and upkeep.
Island or peninsula
An island adds prep space and seating but needs walking room on every side. A peninsula can give similar counter space in a tighter room.
Lighting plan
Layered lighting with ceiling fixtures, under-cabinet task lights and pendants, set on separate switches or dimmers so each can be used on its own.

What this service does not cover

  • Appliance purchases, unless they are written into the agreed scope
  • Asbestos or lead-based paint abatement, which is handled by certified specialists
  • Removing load-bearing walls without engineered plans where the jurisdiction requires them
  • Repairs to hidden damage found during demolition, such as rot or outdated wiring, until the work is reviewed with you and added by written change order
  • Work in other rooms that is outside the agreed scope

Budget planning

What affects cost

  • Layout changes

    Moving plumbing, gas lines or walls takes more labor and inspection than keeping the current footprint.

  • Cabinets

    Construction quality, finish, and whether they are stock, semi-custom or custom.

  • Countertops

    Material, thickness, edge profile, number of seams and the cutouts needed for sinks and cooktops.

  • Electrical capacity

    Older homes may need new circuits or panel work to support current appliances and lighting.

  • Ventilation

    Venting a range hood outdoors through a wall or roof adds labor compared with a recirculating hood.

  • Conditions behind walls and floors

    Water damage, rot or outdated wiring found after demolition adds work before new finishes go in.

  • Finish selections

    Tile, hardware, faucets, sinks and light fixtures range widely in price and installation effort.

Scheduling

What affects the schedule

  • Lead times for cabinets, counters and special-order appliances
  • Countertop templating, which can only happen after cabinets are installed
  • Permit review and the timing of required inspections
  • Selections made late or changed after ordering
  • Conditions found once walls and floors are opened

How to prepare

  • Empty cabinets, drawers and counters before demolition day
  • Set up a temporary kitchen in another room with a microwave, small refrigerator and coffee maker
  • Write down what you store and how you cook so the plan fits your habits
  • Choose appliances early so cabinets can be sized around them
  • Plan to keep children and pets away from the work area
  • Clear a path from the entry to the kitchen for deliveries and debris removal

Process

How Kitchen Remodeling Projects Work

  1. 1

    Consult

    We walk the kitchen with you and talk through how you cook, store food and gather. We note what works, what does not, and the plumbing, electrical and ventilation that could shape the plan.

  2. 2

    Plan

    We set the layout, choose cabinets, counters and finishes, and put the scope in writing. Long-lead items are ordered and any permits are requested before demolition starts.

  3. 3

    Build

    Demolition, rough-in work and inspections come first, then cabinets, counters, backsplash, fixtures and trim. The work area is kept separated from the rest of the home to limit dust.

  4. 4

    Enjoy

    A final walkthrough, completion of any punch-list items, and a review of care for new surfaces, fixtures and appliances.

Questions

Kitchen Remodeling in Memphis: FAQs

Who issues kitchen remodel permits in Memphis?

Memphis and Shelby County Construction Enforcement reviews plans, issues construction permits and inspects work for Memphis, Arlington, Germantown, Lakeland, Millington and unincorporated Shelby County. Building permit applications can be filed online.

Can I stay in my home during a kitchen remodel?

Most people do. Plan on a temporary kitchen elsewhere in the house and expect dust, noise and limited use of the kitchen sink while work is underway. Separating the work area helps keep dust out of the rest of the home.

Should I pick appliances before or after the design?

Early. Appliance sizes, venting and electrical needs affect cabinet sizes and the layout. Changing an appliance after cabinets are ordered can force changes to cabinets, counters or wiring.

Is it worth changing my kitchen layout?

It depends on how well the current layout works. If moving between the sink, range and refrigerator is awkward or prep space is short, a new layout can help. If the flow is fine, keeping it lets more of the budget go to cabinets and surfaces.

Keep planning

CallRequest an Estimate